Home » Krasnodar » EconomicsIn the Olympic capital, started the construction of new railway Sochi-Tuapse.The carrying capacity of the railway line will be increased by double insertions, a length of 30 kilometers.
In Sochi started modernization of the railway line, as well as 70% of goods and materials for building Olympic facilities will be delivered by rail. In the preparation of transport infrastructure for the Olympics, in the Adler district of the city will be led through the second track from "cheerful" to "Tuapse", built a railroad from "Adler" to the airport and from the stationary "Adler" to the village of Krasnaya Polyana. At double the transport will be built underground and overhead crossings, but in places where the road is laid too close to residential neighborhoods establish shumozaschitnye devices. Construction is the company "SMU-329" "Roszheldorstroya.
|